Toowoomba Second Range Crossing opened to traffic

  • Posted by Paula Wallace
  • |
  • 8 September, 2019

THE $1.6 bn Toowoomba Second Range Crossing has officially been opened to traffic and will now take heavy vehicles around north of Toowoomba rather than through it. The large project includes a 41-kilometre-long bypass route including an 800-metre-long viaduct.

This content is for members only

 

Related post