-
Posted by Paula Wallace
- |
-
8 September, 2019
THE $1.6 bn Toowoomba Second Range Crossing has officially been opened to traffic and will now take heavy vehicles around north of Toowoomba rather than through it. The large project includes a 41-kilometre-long bypass route including an 800-metre-long viaduct.
This content is for members only
Create a free account with www.thedcn.com.au to access this exclusive content.
Already a member?Sign in
