-
Posted by Dale Crisp
- |
-
19 December, 2025
It will replace the port’s oldest tug, Sir Robert, which is 22 metres long with 50-tonne bollard pull, and join the 10-year-old twin tugs Tai Pari and Tai Timu, both 24 metres and 74-tonne bollard pull. All three existing tugs are Azimuth stern drive tractor tugs.
The new tug will have at least 80-tonne bollard pull and is expected to be delivered in mid-2027. Some wharf strengthening and infrastructure modifications will be made to the port’s existing tug berths at Mount Maunganui, PoT said.
“We are delighted to have been selected by Port of Tauranga for this landmark hybrid tug project,” said Mr. A. Noyan Altug, president & CEO of UZMAR Shipyard.
“This partnership exemplifies how shared values of innovation, safety, and environmental stewardship can drive meaningful progress toward a more sustainable maritime future. This hybrid tug project marks another step forward in our mission to deliver next-generation, low-emission vessels for ports worldwide.”
