-
Posted by Allen Newton
- |
-
13 May, 2025
A SPECTACULAR engineering milestone for the Scarborough Energy Project has been reached with the joining together of the topsides and hull for the Floating Production Unit (FPU).
This content is for members only
Create a free account with www.thedcn.com.au to access this exclusive content.
Already a member?Sign in
