-
Posted by Paula Wallace
- |
-
24 September, 2020
FIVE quay cranes at Victoria International Container Terminal received an energy efficiency makeover with the installation of LED lighting. Led by VICT’s engineering and facilities team, the upgrade reduced overall electricity usage by 971 megawatt hours.
This content is for members only
Create a free account with www.thedcn.com.au to access this exclusive content.
Already a member?Sign in
