Wind turbine blades on 1000km journey from Geraldton port

  • Posted by Allen Newton
  • |
  • 29 May, 2025

WIND turbine blades delivered to the Port of Geraldton are now beginning a nearly 1000 kilometre road trip to the Mt Weld Hybrid Power Station at Laverton in Western Australia.

This content is for members only

 

Posted by Allen Newton

Allen is DCN's WA correspondent. He is one of WA's most experienced journalists with a career that includes roles as Managing Editor of The Sunday Times and PerthNow and as Editor in Chief of Fairfax's WAtoday.

LinkedIn | Website

Related post