-
Posted by Allen Newton
- |
-
29 May, 2025
WIND turbine blades delivered to the Port of Geraldton are now beginning a nearly 1000 kilometre road trip to the Mt Weld Hybrid Power Station at Laverton in Western Australia.
This content is for members only
Create a free account with www.thedcn.com.au to access this exclusive content.
Already a member?Sign in
