Last wind blade loaded at Geelong

  • Posted by David Sexton
  • |
  • 25 June, 2020

THE last wind blade for the Stockyard Hill Wind Farm, 35km west of Ballarat, was recently loaded at the Port of Geelong by the LCR Group, part of the Qube Renewables team.

This content is for members only

 

Posted by David Sexton

David Sexton is DCN’s senior journalist and has an extensive career across online and print media. A former DCN editor, he returns to covering shipping and logistics after a four-year hiatus working at Monash University during which time he managed production of key reports into the Indonesian ports and rail sectors.

LinkedIn | Website

Related post